15 Mile Falls Substation
Acerca del proyecto
This project will provide necessary upgrades to aging infrastructure while separating shared assets of National Grid’s and Great River Hydro’s.
This proposed project is currently in the planning and design phases. As the project moves forward, National Grid will be seeking local and state approvals.
Beneficios del proyecto
Recursos del proyecto
Noticias y actualizaciones
1st Public Information Session (Pre-SEC Filing)
Preguntas frecuentes
8 FAQsThis proposed Project is currently in the planning and design phases with construction tentatively scheduled to begin in 2028 and end in 2032.
The Project spans an area north of Route 93 at the exit 44 interchange past St. Johnsbury Road to the existing Moore Substation in Littleton, New Hampshire. There will also be work zone setups associated with wire pulls and structure hardware installation on the south side of Route 93.
A strong electrical transmission and distribution system is vital to our region’s safety, security, and economic prosperity. The Project will provide necessary upgrades to aging infrastructure while separating shared assets of National Grid’s and Great River Hydro’s, resulting in a more reliable energy delivery network.
You will be notified in advance if there are any scheduled power interruptions associated with the project.
You will likely see an increase in material and equipment deliveries in and out of the substation. Safety is always a priority, if needed, portions of the Project may be completed utilizing local police details and lane restrictions along public roadways.
National Grid is undertaking extensive community outreach to inform neighbors, public officials, and other impacted stakeholders about the project. The team will be hosting a Public Information Session in Littleton, NH to specifically discuss the transmission line work on this project, called C203/D204, in addition to an Open House to discuss the substation work for this Project.
No. All activities are planned to take place within the existing National Grid substation and adjacent established utility corridors.
Si tiene alguna pregunta o inquietud sobre el proyecto, póngase en contacto con:
Katie Riewestahl
Project Engagement Specialist
Correo electrónico: [email protected]
Teléfono: 1-603-974-3319
Contáctanos
Acerca del proyecto
This project will provide necessary upgrades to aging infrastructure while separating shared assets of National Grid’s and Great River Hydro’s.
This proposed project is currently in the planning and design phases. As the project moves forward, National Grid will be seeking local and state approvals.
Beneficios del proyecto
A more reliable energy delivery network will be obtained by replacing, separating, and upgrading the existing infrastructure, the substation, and corresponding lines in this area.
Recursos del proyecto
Noticias y actualizaciones
1st Public Information Session (Pre-SEC Filing)
Preguntas frecuentes
8 FAQsThis proposed Project is currently in the planning and design phases with construction tentatively scheduled to begin in 2028 and end in 2032.
The Project spans an area north of Route 93 at the exit 44 interchange past St. Johnsbury Road to the existing Moore Substation in Littleton, New Hampshire. There will also be work zone setups associated with wire pulls and structure hardware installation on the south side of Route 93.
A strong electrical transmission and distribution system is vital to our region’s safety, security, and economic prosperity. The Project will provide necessary upgrades to aging infrastructure while separating shared assets of National Grid’s and Great River Hydro’s, resulting in a more reliable energy delivery network.
You will be notified in advance if there are any scheduled power interruptions associated with the project.
You will likely see an increase in material and equipment deliveries in and out of the substation. Safety is always a priority, if needed, portions of the Project may be completed utilizing local police details and lane restrictions along public roadways.
National Grid is undertaking extensive community outreach to inform neighbors, public officials, and other impacted stakeholders about the project. The team will be hosting a Public Information Session in Littleton, NH to specifically discuss the transmission line work on this project, called C203/D204, in addition to an Open House to discuss the substation work for this Project.
No. All activities are planned to take place within the existing National Grid substation and adjacent established utility corridors.
Si tiene alguna pregunta o inquietud sobre el proyecto, póngase en contacto con:
Katie Riewestahl
Project Engagement Specialist
Correo electrónico: [email protected]
Teléfono: 1-603-974-3319