Maplewood #16
نبذة عن المشروع
The Maplewood 16 Substation Project will update equipment to support the existing substation and regional energy needs. The project includes installing a new fence that provides both security and noise reduction, building a new control house, and adding a new transformer. Before this work begins, crews will manage vegetation and remove selected trees within the substation property.
فوائد المشروع
موارد المشروع
-
Maplewood Sound Wall Installation Update, September2025
-
Maplewood Sound Wall Installation Update, July2025
-
Maplewood Sound Wall Installation Notification, May 2025
-
Maplewood Project Notification, October 2024
-
Maplewood Project Notification Oversized Delivery, September 2024
-
Maplewood Project Notification, August 2024
-
Maplewood Project Notification, March 2024
مراحل البناء
-
تجهيز الموقع
The first step is clearing trees and brush. This work allows construction crews to safely clear the area for new equipment and remove trees that could fall into the substation yard.
-
الضوابط البيئية
بعد ذلك، تُتخذ خطوات لحماية المنطقة أثناء البناء. وقد تشمل هذه الخطوات استخدام الحصائر، وحواجز الطمي، وحاويات مواد البناء.
-
Substation Upgrades
Next, new foundations are poured, a new control house is built, and other equipment, including a transformer, is placed. This work also includes installing a new security fence and sound wall along the residential side of the substation. Crews use heavy equipment, including cranes.
-
استعادة
After construction, crews restore the work area and return the landscape to its original condition as much as possible. (Unless otherwise specified in regulatory requirements or by a landowner).
اتصل بنا
نبذة عن المشروع
The Maplewood 16 Substation Project will update equipment to support the existing substation and regional energy needs. The project includes installing a new fence that provides both security and noise reduction, building a new control house, and adding a new transformer. Before this work begins, crews will manage vegetation and remove selected trees within the substation property.
فوائد المشروع
To keep electric service safe and reliable, National Grid will upgrade the station’s protection and monitoring systems. This equipment will be installed in a new control building designed to hold the updated systems.
موارد المشروع
-
Maplewood Sound Wall Installation Update, September2025
-
Maplewood Sound Wall Installation Update, July2025
-
Maplewood Sound Wall Installation Notification, May 2025
-
Maplewood Project Notification, October 2024
-
Maplewood Project Notification Oversized Delivery, September 2024
-
Maplewood Project Notification, August 2024
-
Maplewood Project Notification, March 2024
الأخبار والتحديثات
مراحل البناء
-
تجهيز الموقع
The first step is clearing trees and brush. This work allows construction crews to safely clear the area for new equipment and remove trees that could fall into the substation yard.
-
الضوابط البيئية
بعد ذلك، تُتخذ خطوات لحماية المنطقة أثناء البناء. وقد تشمل هذه الخطوات استخدام الحصائر، وحواجز الطمي، وحاويات مواد البناء.
-
Substation Upgrades
Next, new foundations are poured, a new control house is built, and other equipment, including a transformer, is placed. This work also includes installing a new security fence and sound wall along the residential side of the substation. Crews use heavy equipment, including cranes.
-
استعادة
After construction, crews restore the work area and return the landscape to its original condition as much as possible. (Unless otherwise specified in regulatory requirements or by a landowner).