Starting in the summer of 2026, National Grid plans to refurbish nearly 16 miles of overhead transmission lines and poles within the existing right-of-way corridor. This work extends from the Sandy Pond Substation in Ayer, MA, to the Tewksbury Substation in Tewksbury, MA.
فوائد المشروع
الأخبار والتحديثات
National Grid invites you to meet the Sandy Pond to Tewksbury Reliability Project team at one of our upcoming open houses. The first open house will be held Thursday, July 30, 2026, at the Billerica Public Library located at 15 Concord Road. The second open house will take place Thursday, August 6, 2026, at the Chelmsford Senior Center located at 75 Groton Road in North Chelmsford.
All community members and interested parties are welcome to attend either event. Open house attendees will have the opportunity to connect with our team and learn about the upcoming project, including an overview, anticipated activities, and the proposed schedule.
- 2022 - Engineering Begins
- 2026 - Early Access Construction Begins
- 2026 - Engineering Complete
- 2027 - Construction Begins
- 2027 - Early Access Construction Complete
- 2032 - Construction Complete
مراحل البناء
-
تجهيز الموقع
تتمثل الخطوة الأولى في إزالة الأشجار والشجيرات. يتيح هذا العمل لفرق البناء إنشاء طرق وصول آمنة وإزالة الأشجار التي قد تسقط على خط الكهرباء.
-
الضوابط البيئية
بعد ذلك، تُتخذ خطوات لحماية المنطقة أثناء أعمال البناء. وقد تشمل هذه الخطوات وضع الحصائر، وحواجز الطمي، وحاويات غسيل خرسانية لمواد البناء.
-
Substation Upgrades
يتم تركيب أساسات وهياكل جديدة، بالإضافة إلى كابلات الألياف الضوئية والأسلاك الجديدة. تُزال الهياكل القديمة، ويتم تزويد الأسلاك الجديدة بالطاقة. تستخدم فرق العمل معدات ثقيلة، بما في ذلك الرافعات.
-
استعادة
After construction, crews restore the work area and return the ground as close as possible to its original condition, unless otherwise specified in regulatory requirements or by a landowner agreement.
اتصل بنا
نبذة عن المشروع
Starting in the summer of 2026, National Grid plans to refurbish nearly 16 miles of overhead transmission lines and poles within the existing right-of-way corridor. This work extends from the Sandy Pond Substation in Ayer, MA, to the Tewksbury Substation in Tewksbury, MA.
فوائد المشروع
Improves electric reliability for customers in the region.
Replaces older wooden structures with new light-duty steel structures.
Upgrades are completed within the existing utility right-of-way.
موارد المشروع
الأخبار والتحديثات
National Grid invites you to meet the Sandy Pond to Tewksbury Reliability Project team at one of our upcoming open houses. The first open house will be held Thursday, July 30, 2026, at the Billerica Public Library located at 15 Concord Road. The second open house will take place Thursday, August 6, 2026, at the Chelmsford Senior Center located at 75 Groton Road in North Chelmsford.
All community members and interested parties are welcome to attend either event. Open house attendees will have the opportunity to connect with our team and learn about the upcoming project, including an overview, anticipated activities, and the proposed schedule.
الجدول الزمني
مراحل البناء
-
تجهيز الموقع
تتمثل الخطوة الأولى في إزالة الأشجار والشجيرات. يتيح هذا العمل لفرق البناء إنشاء طرق وصول آمنة وإزالة الأشجار التي قد تسقط على خط الكهرباء.
-
الضوابط البيئية
بعد ذلك، تُتخذ خطوات لحماية المنطقة أثناء أعمال البناء. وقد تشمل هذه الخطوات وضع الحصائر، وحواجز الطمي، وحاويات غسيل خرسانية لمواد البناء.
-
Substation Upgrades
يتم تركيب أساسات وهياكل جديدة، بالإضافة إلى كابلات الألياف الضوئية والأسلاك الجديدة. تُزال الهياكل القديمة، ويتم تزويد الأسلاك الجديدة بالطاقة. تستخدم فرق العمل معدات ثقيلة، بما في ذلك الرافعات.
-
استعادة
After construction, crews restore the work area and return the ground as close as possible to its original condition, unless otherwise specified in regulatory requirements or by a landowner agreement.